ROI Infographic

The Math Behind Smarter Streets

Every dollar spent at the right time saves five later. Here is the data that makes the financial case undeniable.

Pavement Life Cycle

PCI Decay Curve

Pavement Condition Index drops from 100 to 20 over 25 years. Intervening early costs a fraction of reconstruction.

100 80 60 40 20 0
PCI 70 — Seal Coat Window
PCI 50 — Overlay Window
PCI 25 — Reconstruct
$2/SY
Seal Coat
$15/SY
Overlay
$80/SY
Full Reconstruct
0
5
10
15
20
25
Pavement Age (Years)
GOOD (PCI 70-100)
FAIR (PCI 40-69)
POOR / FAILED (PCI <40)
Cost Per Square Yard

Treatment Cost Ladder

The difference between the cheapest and most expensive fix is 80-320x. Early treatment is the highest-ROI investment a city can make.

Crack Sealing
PCI 70-90 • +3-5 yr life
$0.25-$1
Chip Seal
PCI 65-85 • +5-7 yr life
$1-$4
Slurry Seal
PCI 65-80 • +4-7 yr life
$2-$2.50
Thin Overlay (2")
PCI 50-70 • +8-12 yr life
$7-$20/SY
$7-$20
Mill & Overlay
PCI 40-60 • +10-15 yr life
$15-$20/SY
$15-$20
Full Reconstruction
PCI <25 • Full reset
$40-$80+/SY
$40-$80+
$0 COST PER SQ YARD → $80+
The Exponential Penalty

Why Delay Destroys Budgets

Pavement deterioration is not linear. The same 40% PCI loss that takes 75% of the pavement's life to occur the first time happens again in just the final 12%.

First 75% of pavement life
40%
PCI loss
75% of lifespan
Slow, predictable deterioration. Preventive treatments extend this phase for pennies on the dollar.
Acceleration
Last 12% of pavement life
40%
PCI loss
12% of lifespan
Rapid, cascading failure. Once past the tipping point, costs explode 6-40x.
100 50 0 YEARS → 75% LIFE SLOW, CHEAP FIXES RAPID FAILURE PCI SCORE
Strategy Comparison

Worst-First vs. Optimized Approach

Same city, 200 lane-miles, $3M/year budget. Two strategies, dramatically different results.

Worst-First
Lane-Miles Treated 5
Treatment Type Reconstruction only
Network PCI Trend -2 pts/yr
Budget Reach 2.5% of network
Network Coverage Per Year
Remaining Untreated: 97.5%
5-Year PCI Projection
YR 1 YR 5
Optimized
Lane-Miles Preserved 40
Lane-Miles Overlaid 8
Network PCI Trend Holds / +1 pt/yr
Budget Reach 24% of network
Network Coverage Per Year
Preserved: 40 mi • Overlaid: 8 mi
5-Year PCI Projection
YR 1 YR 5
10x
More lane-miles treated
24%
Network reached per year
+3
PCI points gained in 5 years
Annual Optimization Value
$500K+
In recovered annual value from a $5M/year budget
That is 10% of total spend redirected from emergency reconstruction to high-ROI preservation — every single year.